Plumbing & Eq.

 

Click Below...

Home ] Up ]

In addition to using Schedule 40 PVC (very thick pipe) we keep all plumbing under pressure throughout the construction process. We routinely check these pressure readings to insure that the plumbing is secure. Our plumbers follow a detailed plan for the location of every feature, pool return, and drain. You will notice that pipes are protruding out from the pool dig. These will be cut off near the end of construction and will finish flush to the final pool wall.

If you live in the house, we are building the pool in; we will install the equipment the day we plumb the pool. If your home is not occupied or is under construction, we will delay the equipment set until you are in the house. This is necessary because unfortunately there are people out there who will walk off with your pool equipment if it is easily accessible. If you own the home and the equipment is stolen, your insurance will cover the loss and will pay the replacement cost. From a technical standpoint, once the equipment is attached and installed, you own it.


Home ] Up ] Pool Care ] Equipment ] Featured Pools ] Waterwalls ] Solar Heating ] Commercial Pools ] Links / Info ] Design ]
WaterWorks Of Texas - Call (832)541-5753 - Click here to Email
Copyright © 2005 WaterWorks of Texas